The museum and research center of the Celtic culture. The museum was opened in 2011 by the Hessen office of built heritage conservation ( Landesamt fȕr Denkmalpflege Hessen). It is located at the important place of discovery of a Celtic settlement aged about 5 thousend B.C. In the front of the building you see visitors watching and enjoing at the location.


Understanding your manpower and cash issues can determine the success or failure of any project. Do not overestimate your capabilities or underestimate your cash flow.  Map out the details of all of the projects going on and what you are bidding that could happen in the near future.

Inflexibility is another challenges. Map out your plan and continually review your plan versus reality. Be willing to make changes when you see your plan is failing. Without a plan or refusing to gauge success against your plan has doomed many companies to continue down a road to failure. Have a willingness to change the plan and learn. Fail teachs you a lot.



Client: Awesome Company
Location: Barcelona, Spain
Surface Area: 450,000 m2
Completed: 2015
Value: $900,000
Architect: John Doe


  • Expediting and securing all permits, licenses, inspections, sign-offs, and occupancy certificates required by jurisdictional agencies.
  • Coordinating and supervising work performed by trades and outsite suppliers for quality, completeness, schedule, and conformity with plans and specifications/
  • Upon substaintial completion of contruction, examine work to assure efficacy quality and proper commisioning of equipment.
  • Developing a community relations program.
  • Provide the highest quality service to build-up the best result of the project as the agreement between 2 sites.


Wycon (UK) Ltd has carried out many projects for our organisation as we are an expanding business and have needed to optimize our warehouse space. Wycon (UK) Ltd have assisted us in finding the optimum solutions for our business with minimum disruption to our normal working patterns. In particular we asked Wycon (UK) Ltd to design, build and project manage a two tier mezzanine floor including the electrics and fire rating. From the outset we were extremely happy with the approach that Wycon (UK) Ltd took to deliver the project on time and within budget. I would also like to add the health and safety aspects were very professional. I would not hesitate to recommend Wycon (UK) Ltd.

Looking for a quality constructor for your next project?